CreaTower: From Mixed-Use Demolition to High-Rise Project

In the Zug Tech Cluster, CreaTower I is an innovative office high-rise that meets high standards for functionality, resource efficiency, and circularity.

Entry from 28.05.2026

Creatower Referenzen 1

For the CreaTower I construction project, KIBECO is supplying over 300 m³ of KIBECO MIGROX Oulesse, a cement-free lean concrete. The material consists of recycled mixed demolition waste and contains no cement. This conserves primary raw materials and reduces CO₂ emissions compared to conventional lean concretes.

What’s particularly exciting is that the load-bearing and ceiling structures are designed to be dismantled—thereby turning the CreaTower itself into a repository for raw materials.

Key Data

Location: Zug, Switzerland
Execution year: 2026
Building material: KIBECO Leancrete Oulesse (lean concrete)
Quantity: 300 m3
Participants: Tech Cluster Zug AG, VZ Depotbank, Gigon Guyer Partner Architects, WaltGalmarini