Infrastructure for the Future
In Schaffhausen Herblingen, right next to the FC Schaffhausen stadium, a Fastned fast-charging station for electric cars and trucks is being built.
Entry from 10.04.2026
In Schaffhausen Herblingen, right next to the FC Schaffhausen stadium, a Fastned fast-charging station for electric cars and trucks is being built.
Entry from 10.04.2026
KIBECO Leancrete MIGROX, our cement-free lean concrete made from mixed demolition waste, was used in the construction of the utility lines for the Fastned fast-charging station. Approximately 20 m³ were used for the base, the encasement, and the backfill around the utility lines.
The project was carried out by KIBAG Bauleistungen at the Müllheim-Wigoltingen site, which implemented a conventional civil engineering application using a material that keeps existing resources in the cycle while simultaneously reducing CO₂ emissions.
Charge energy. Conserve resources.
Location: Schaffhausen, Switzerland
Execution year: 2026
Building material: KIBECO Leancrete Oulesse (lean concrete)
Quantity: 20 m3
Participants: KIBAG Bauleistungen, Fastned