Infrastructure for the future
A Fastned fast charging station for electric cars and trucks is being built in Schaffhausen Herblingen, right next to FC Schaffhausen’s stadium.
Entry from 10.04.2026
A Fastned fast charging station for electric cars and trucks is being built in Schaffhausen Herblingen, right next to FC Schaffhausen’s stadium.
Entry from 10.04.2026
KIBECO Leancrete MIGROX, our cement-free lean concrete from mixed rubble, was used for the line construction of the Fastned fast charging station. Around 20 m³ were used for the base, cladding and covering of the pipes.
The project was implemented by KIBAG Bauleistungen at the Müllheim-Wigoltingen site, which implemented a conventional application in civil engineering with a material that keeps existing resources in the cycle and reduces CO₂ emissions at the same time.
Charge power. Conserve resources.
Location: Schaffhausen, Switzerland
Execution year: 2026
Building material: KIBECO Leancrete Oulesse (lean concrete)
Quantity: 20 m3
Participants: KIBAG Bauleistungen, Fastned